Welcome to CAINE MODEL, the specialist web-based service providing the latest Building Control required 2010 Part
L2A Compliance for all UK Commercial Buildings.
We have made our service as efficient and user friendly as possible.
By providing us with the building drawings and details requested on our data form, we will contact you with a fully inclusive
quotation to demonstrate building regulation compliancy.
WHAT IS AN SBEM? SBEM (Simplified Building Energy Model) is a Government-defined process in accordance with Part L Building
Control Regulations.
A calculation of the energy performance of new commercial/industrial/retail buildings.
DO I NEED AN SBEM?
Yes, from 7th April 2006 all new buildings require an SBEM
Calculation.
WHAT DO I NEED TO DO?
There are 2 stages - the first stage
(called the 'design' stage) needs to be completed and submitted to your Building Control Body or Approved Inspector
at the same time as your Building Control Application.
The second stage (called the 'as-built' stage) comes
into force when the build is completed and a 'pass' Certificate will need to be produced for presentation to your
Inspector.
Caution: Your Building Control Officer or Approved Inspector may request a re-submission of the SBEM
Calculation if any changes are made to the specification after the design stage has been submitted.
HOW CAN WE HELP?
Our aim is to help you achieve a 'pass' and we provide the following:
- Advice on how to achieve a 'pass'
- Friendly, helpful, experienced
Team
- Advice and recommendations
- Detailed Report for each building
URGENT DEADLINE?
All our Part L Calculations
are completed within 7-14 days (subject to receiving all relevant information). However if you have a deadline, our Assessors
will complete it within 48 hours with our "Fast Track" service.